Version
Revision 1
Used in
- EV Base (6020….) / (6021….) / (6023….) / (6030….) / (6031….)
Parts needed
- [EV-PCB-SIGNALBOARD-1] - signal board
Tools needed
- Allen 2.5
- Hex 10
- Hex 19
- Hex 5.5
Charger Overview
Replacement instructions
-
Loosen the 6 screws on the back side of the unit. Remove the M6 screw and the anchor nut on each side of the unit. Remove the back plate of the unit and place it aside. [Allen 2.5 Hex 10 Hex 19]
-
Disconnect the 12P cable.
-
Loosen the 4 M3 nuts and remove the signal board. [Hex 5.5]
-
Before installing the replacement signal board, check that the spacers are still in place. Make sure the board is correctly oriented: the connector must be on the bottom left of the board.
-
Secure the signal board with the 4 M3 nuts. [Hex 5.5 - Torque 1 N.m]
-
Reconnect the 12P cable to the signal board.
-
Place the back plate back on the unit. Tighten the M6 screw and the anchor nut on each side of the unit. Tighten the 6 screws on the back side of the unit. [Hex 10 - Torque 5 N.m Hex 19 - Torque 50 N.m Allen 2.5 - Torque 2.5 N.m]
Replacement instructions App
After physical replacement, you will need to power-cycle the Connect and replace the signal board via the app.
Settings → Charging station → Select module → Replace
How to replace a Charging Station module via the Smappee App