Version
Revision 1
Used in
- EV One (6521….) / (6522….) / (6531….)
Parts needed
- [EV-PCB-SIGNALBOARD-1] - signal board
Tools needed
- Allen 2.5
- Small flat screwdriver
- Flat screwdriver
- Hex 8
Charger Overview
Replacement instructions
-
Remove the 2 screws at the bottom of the housing. [Allen 2.5]
-
Remove the 2 screws holding the door. Place the door in a safe location and remove the housing tube. [Allen 2.5]
-
Remove the clear cover on top of the signal board and put it aside.
-
Loosen and remove the 4 screws holding the signal board. [Allen 2.5]
-
Disconnect the 12P cable from the defective signal board. Connect the 12P cable to the replacement board and put the board into place.
-
Secure the replacement signal board in place with the 4 screws. Make sure the signal board is properly positioned: the Smappee house icon should be oriented as shown in the picture. [Allen 2.5]
-
Place the clear cover back in position.
-
Put the housing tube back in place, secure the door and add the 2 screws at the bottom of the unit. [Allen 2.5 (hand-tight)]
Replacement instructions App
After physical replacement, you will need to power-cycle the Connect and replace the signal board via the app.
Settings → Charging station → Select module → Replace
How to replace a Charging Station module via the Smappee App